845 results found
-
3rd party image editing
Adjust Image on 3rd party images
1 voteWe have requested more information from the reporter to better understand this request.
Thanks,
Nardine Hanna, Solargraf Application Specialist
-
Roof dimensions
Roofing Dimensions only show on the "Roof Design".
Is there a way we can have that listed on the Solar Design Tab site-wide?
I believe it will help Design Partners company wide who use SolarGraf make more accurate designs as they do not have to go back and forth between the Roof Design Tab and Solar Design.1 vote -
to include Fit revenue as a column in the breakdown or as a separate table that includes monthly production, self-consumption, and export-
to include Fit revenue as a column in the breakdown or as a separate table that includes monthly production, self-consumption, and export-
1 vote -
Set pool start and end time
When setting the run time for a pool pump, the selection allows the number of hours run, but it always ends at 6:00 pm.-Please allow us the ability to set the start and end time. NEM 3.0 after 4:00 pm makes no sense.
1 vote -
1 vote
-
1 vote
-
Show Energy Exported for FiT
Currently, expected exported energy is only shown to users in the form of a monthly Feed in Tariff dollar-value. We would like the ability to show customers both total expected exports (kWh) and FiT value on printed proposals (no hover-over) where the feed-in tariff value is credited toward the utility bill. As it exists, the only way to print a proposal with FiT values is to toggle-off the command to credit the FiT value against utility bills. This artificially increases the "Estimated New Utility Bill" and "Estimated New Monthly Payment" on a loan, lease, or ppa proposal.
1 vote -
Solargraf is very slow. The pages take several minutes to load
Solargraf is very slow. The pages take several minutes to load
There is not a section in particular. It could be any section.1 vote -
Apply losses individually per array
Apply losses individually per array
1 vote -
As an installer I want the Project Time Line to have a formula based on CA law for deposits
The law in CA states that the initial deposit of a project is either 10% of the gross amount of the deal or $1000 whichever is less. So it would be "If "Gross Amount" x 10% > $1000.00 then show $1000, if not then show "Gross Amount" x $10%.
The alternative display would be (but more complex):
The law in CA is: At Contract signing contractor can not charge more than $1000 OR 10% of contract price (whichever is less.)If we had a contract for 30k we can charge $1000 but not 10% (3,000)
If we could always set…
1 vote -
Ability to Optionally generate static copy of quote when it is opened (rather than only when signed)
1 vote -
1 vote
-
Remove mandatory default pricing for Batteries for BDT/Ppw
Solargraf should not require any default pricing for solar ppw or for batteries. we should be able to add batteries to a favorites list similar to modules and should not be required to have default pricing. for companies that customize pricing based on the project, default pricing makes everything so much more difficult and annoying.
1 vote -
1 vote
-
Project/ Docusign placement saved for future documents added
Project and Docusign placeholder placement to be retained for future application on new contracts to reduce repetitive task.
1 vote -
Region management tool
To customize Solargraf based on regional needs. (Region management tool)
- Regional system size limitations
- Default utility section based on Area, not the state
- Jurisdictions1 vote -
Financing Section - "Old Utility Bill" to reflect past bills
Under the financing section of the proposal there is a line that reads "Old Utility Bill" then gives an amount. This amount should not represent 'past' utility bills and should represent and an average monthly utility cost for the next 12 months if the consumer does not get solar. Of course that amount should include the inflation rate to be most accurate. That may already be how that amount is calculated; if so, then the amount should just be described differently.
1 vote -
to popup a recalculating message when changing the project price on the project level
When changing the project price on the project level, it does update on the webquote immediately, it takes several seconds, unless you change the financing option ( that is the only way it happens immediately). The client asked if there is a way to sort a thinking circle that shows the system is recalculating the information on the proposal. This would help them a lot when pitching clients.
1 vote -
1 vote
-
1 vote
- Don't see your idea?