832 results found
-
Azimuth Details
Solar Graf
should consider adding the - Orientation Azimuth Degree to the Project Information Page
1) easier for us to quickly confirm Azimuth is correct.
2) allow owner to see Azimuth for proposed project.I take multiple steps to confirm Azimuth
1) edit drawing
2) click on panels
3) review Array Details
4) redo if you have multiple option in proposal5) need to review - Staffs work quickly just by reviewing - Manage Options then projectj detail - ONE PLACE
4 votes -
Pricing tables based off of panels selected
Pricing Tables based off of panel choice. We as a company change panels often and also offer higher tiered panels as an option if your roof can't accommodate the panels need to produce enough wattage. When switching to a higher tier wattage the pricing table will shift to a different starting price based off of kW. When adding a new panel in you can set an existing pricing table or create a new one.
4 votes -
Be able to increase logo on Cover page.
Today, the logo on the front page is too small. Even after the recent update, it is hard for us to distinguish us from the other companies.
3 votes -
Panel layout on Webquote/PDF (Not separated by array)
The user would like for the panel list to not be separated by array as seen in the attached screenshot
3 votes -
Re-locate the roof after a project is created
On occasion, especially for rural projects, the roof is incorrectly identified during project creation. It is tedious to re-center the image in the Change Imagery dialog within the design tool. We'd like a quicker way to re-locate the roof after a project has been created. We don't want to have to create a new project, since any work entering the customer's name, consumption data, etc would be lost
3 votes -
Departing Load Charges
The users need "Departing Load Charges" for Non-Export solar systems in California to be modeled in Solargraf and these charges to be included in the remaining solar bill calculations.
The CPUCs in California add "Departing Load Charges" to Non-Export system clients.
Initial research showed these charges are not explicitly listed in Genability tariffs and must currently be added manually as custom costs.I can confirm that these charges are already incorporated into the pre- and post-solar tariffs of California utilities. The utility has indicated that this rate schedule consists of multiple charges, all of which are reflected in our tariffs.
…
3 votes -
Adding batteries on existing systems to system expansion calculations
batteries on existing systems are not currently being included in expansion system project calculations. Client would like this variable added to calculations on system expansion projects.
3 votes -
As an installer I want to increase the number of battiers. Up to 16 for PW3 and 24 for IQ5P
Right now it's maxed at 4 for PW3 and 8 for IQ5P, we can install multiple gateways with 4 PW3 per gateway. Meaning we can easily exceed 4 PW3.
3 votes -
3 votes
-
3 votes
-
3 votes
-
As an installer, I want a tab for "Gas Bills & Consumption"
From client directly:
I lose credibility when I claim a 91% offset when if you do the math here it is 46%. I know the reason is that the software doesn't differentiate between gas and electricity so when I add a gas bill it treats it as kWh.
So we need to be able to show gas savings separately. How we've been doing this is for example, if gas is 150 and electricity is 150, the total is 300. So we add 300 as the total utility and we add a heat pump and set a energy savings of 50%…
3 votes -
As an installer, I want a ground mount to look like a ground mount
Acceptance Criteria:
When an array is placed on the ground, a ground mount appears below them.
The ground mount is represented in the UI by a series of metal “poles” that stand vertically, and run from the ground to the array.
The bottom of panels placed on the ground appear 1m from the ground.
Poles appear at the center of the array, relative to the direction in which it is tilted.
Poles appear 0.5 from each edge (horizontal) of the array.
The poles are cylindrical with radius 0.1m.
3 votes -
purchasing proposal after project creation
please make it possible to order a proposal after project creation sometimes i dont know i need it until i try it myself
3 votes -
Custom Placeholder Functionality (% percentage value)
Add additional functionality to custom placeholders such as a "Deposit" custom placeholder that I can input a value of a certain percentage of system cost as the placeholder value rather than a static value.
3 votes -
As an installer I would like support for dual axis tracker mounting type in 3D design tool
As an installer I would like support for dual axis tracker mounting type in 3D design tool
3 votes -
Dark mode for Solargraf
As an installer I want the ability to display Solargraf in Dark-mode.
3 votes -
Display Production Estimate in KWH/KW DC
Can we display the energy production has KWH / KW DC on the proposal? Industry thinks in-terms of DC and not AC.
3 votes -
PDF Proposal Customization
Ability to have the Salesperson's contact info and picture on the PDF version of proposals.
Ability to customize PDF proposals.
3 votes -
Regional equipment selection
Ability to manage Approve Material List (AML) based on region / hierarchy.
We discussed the possibility of having SolarGraf enable and disable panels, inverters and batteries based on regional data provided by LGCY. Bhavani mentioned that this is already on the roadmap and will provide a date.Additional feature is to equipment that will be inventory based from Netsuite
3 votes
- Don't see your idea?