Skip to content

Solargraf Features


Solargraf Features

Categories

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

23 results found

  1. As an installer, I want a real EG4 battery image vs current stock.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Installers would like the ability to add custom or new panel materials directly in Solargraf without needing to submit a request for Solargraf to add them.

    This would improve flexibility when working with new manufacturers, temporary supply changes, or non-standard panels.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Add hybrid inverter to list of inverters

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Right now, when we select materials they are added to a singular list.

    We would like them segmented for new projects vs System expansion. This would also mean that only materials related to each project would be available upon project creation.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    2 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Ground mount systems always cost more, if when selecting a ground mount system it would automatically incur a price change to the preselecting ppw increase it would be awesome

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. The pricing and functionality of the meter collar doesn't fit into the grid tied or backup molds as they stand now.

    The backup pricing is much higher than the grid tied, but has the backup and reserve functions that would be used for the meter collar.

    The grid tied option is much closer in price and could have an adder on it, but doesn't have the reserve capability.

    There needs to be a third option to have the correct pricing and backup functionality, otherwise these will have consistent design issues and lost revenue.

    This is for PW3 and upcoming Meter…

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Sort materials between different materials pages.

    Sort materials between different pages. Right now you can move a material to the "top" of the existing page, but not between pages.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. We would like to see the black-on-black panels, specifically the Q.PEAK DUO BLK ML-G10.a+ 400Watt show as all black panels. Right now, there are grey borders around the entire panel and around each cell. We would like those to be black. A screenshot is attached for how we would like it to look.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Include "MSRP" for Enphase products within catalog.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Ability to manage Approve Material List (AML) based on region / hierarchy.
    We discussed the possibility of having SolarGraf enable and disable panels, inverters and batteries based on regional data provided by LGCY. Bhavani mentioned that this is already on the roadmap and will provide a date.

    Additional feature is to equipment that will be inventory based from Netsuite

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. When certain materials such as roofing material is set, a default preset list of components are assigned to the project. For example: If rolled asphalt is set as roof material; racking, standoffs and flashings are set to predetermined (by the company) default components.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. 2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. In the material list there should be a monitoring section for a list of monitoring options. please make it happen.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. If the client adds a panel specification when creating a proposal; he would like this information stored directly on his settings so he does not have to manually add it again in the future. The client is aware he can add it on his settings page, but he would like a new functionality where the information is stored automatically when creating the design, so he does not have to add it twice ( on the project level and company level)

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. I would like to see a Generac PV link and battery calculator in my SolarGraf account reference project.

    6223 Fringe Sage Ct NE, Albuquerque, NM 87111, USA

    Please see my Alt account at Albert@nmsolarpro.com for example

    See option 1 settings for easy review

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
← Previous 1
  • Don't see your idea?