Skip to content

Solargraf Features


Solargraf Features

Categories

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

825 results found

  1. Installers want the option to have MACRS depreciation lower the Net cost shown on proposals.

    Right now, when MACRS depreciation is entered on a project, it shows on the proposal on its own line below Net cost. Net cost doesn't include it. This is by design, since MACRS is a tax benefit received over the depreciation schedule, not an upfront incentive.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Incentives  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. I would like my list of exported leads to include the Solargraf user/users who are assigned to a lead.

    0 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    Under review  ·  0 comments  ·  Others  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. As a commercial solar user, I want the MACRS depreciation value to be deducted from and displayed alongside the net system cost so that customers can clearly see the total financial benefit and true effective project cost.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. As a solar designer, I want the ability to select CARE/low-income customer rates for NEM 2 system expansion projects using CCA utilities so that savings calculations accurately reflect the customer's actual utility rate structure.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Utility Settings  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. As a user, I want to specify the number of inverters I want to use for an array before running automatic stringing, so that Solargraf can distribute and configure the strings based on my preferred inverter quantity while maintaining electrical validation requirements.Business Impact: Current automatic stringing may add more inverters than desired, particularly for large commercial systems (e.g., 200–500 kW). Users must manually add inverters and string panels individually, which is time-consuming and inefficient. Customer confirmed this is an important workflow improvement for C&I project design.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. From time to time, a contract may need to be voided due to a spelling error, incorrect customer information, or other revisions that require a new agreement. When this happens, we would like to prevent clients from continuing to receive automated DocuSign reminder emails for a contract that is no longer valid.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. As a user, I want the AI chatbot to provide array dimensions, perimeter measurements, and related design metrics directly from a completed system design so that I can quickly estimate materials such as squirrel guard, critter guard, wire management components, and other balance-of-system items without manually calculating measurements from the layout.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. This user advises that for gross feed-in tariff, current tariff & consumption is not relevant on the proposal. The "savings" are not traditional savings (where production offsets purchases from the grid). Instead, all production is exported, so the PV system is a revenue-generating asset but has no impact on the site's future import bills. He wants the savings section of the proposal to be adapted for gross feed-in tariff to remove any mention of current consumption, and to focus on the cost of the system, revenue generated from exports, ROI & payback

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    Planned  ·  0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. As a user, I want Solargraf to support the applicable Massachusetts SMART incentive structure and term, so that I can accurately model projected revenue for commercial solar projects.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    In Progress  ·  0 comments  ·  Incentives  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. As a user, I want Solargraf to support the Connecticut NRES incentive program and its applicable rates and terms, so that I can estimate revenue for eligible commercial solar projects.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    Planned  ·  0 comments  ·  Incentives  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. As a user, I want gross feed-in project proposals to exclude utility consumption and savings information and instead present exported energy revenue, costs, incentives, and payback separately, so that the proposal accurately reflects a project that generates income rather than offsets utility usage.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Financing  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. This user often has multiple arrays in a single design. When entering array details to generate a BOM via Pegasus, he wants to apply those details to all arrays, rather than define the same details for each array, one after the other. He advises it is fair to assume all arrays will have the same details

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Panels are sometimes separated into multiple arrays when their spacing isn't uniform (owing to obstructions). The user wants to bulk-select these arrays and move them as one

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. This user wants to show or hide setbacks & pathways independently in the DWG download

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. As an installer, I would like certain sales reps to only see/choose certain pricing tables, and not be able to see other pricing tables.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. This user wants the list of microinverters shown in the design tool to be validated against the selected panel, either when creating or editing an array, such that only compatible combinations of panel & micro are used

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. As an installer I would like to be able to create an incentive that is paid out based on a percentage of the battery (storage) cost only

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    Planned  ·  0 comments  ·  Incentives  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
← Previous 1 3 4 5 … 41 42
  • Don't see your idea?