832 results found
-
Make cash vs financing toggle more visible in proposals
Homeowners often aren’t aware that multiple financing options are available in the proposal. Making the cash vs financing toggle more visible, especially within the payment or detailed proposal section, would help customers better understand their options and reduce confusion around pricing and payments
2 votesThis idea had been previously closed, I reopened upon examination that this feature hasn't been implemented.
-
Add an “Approve for stamps” button to the Permit Order page
Add an “Approve for stamps” button to the Permit Order page.
Currently, users must submit a revision and leave a note, which creates extra steps and confusion, particularly for new users.2 votes -
Allow us to complete the "Render 3D" steps manually. This seems like the old Wizard which never worked great.
Allow manual step-by-step 3D roof modeling alongside automated rendering.
In the previous design flow, users could either use the Wizard or complete each modeling step manually. Some users preferred the manual approach and did not rely on the Wizard.
Because the user associates Render 3D with the old Wizard experience, they feel they’ve lost control and now have to spend more time correcting automated results.2 votes -
Bulk archive projects
As an installer I would like to bulk archive projects instead of one at a time.
2 votes -
Enable customization of the shade report layout for LightReach projects
As an installer, I would like the ability to customize the shade report layout for LightReach projects.
The current shade report is primarily a technical loss report (TOF, SAV, TSRF percentages) and offers limited flexibility. Installers report that this format does not always support LightReach documentation or customer-facing needs, and additional layout control would help them present shading impact more clearly.2 votes -
Automatically carry forward existing system production data for system expansions
When adding a system expansion, the existing system’s solar production data should automatically be included in the usage information.
Currently, installers must manually go back and re-enter this data. Automatically carrying it forward would improve accuracy, reduce manual work, and prevent errors when modeling expansions.
2 votes -
As an installer, I want the PW3 battery to be added automatically when this inverter is used
When he adds the PW3 inverter in solar design, he feels it’s redundant to have to separately add the PW3 battery under battery design.
2 votes -
Make it easier to snap portrait panels to landscape
This user wants it to be easier to snap portrait panels to landscape panels, and vice versa
2 votes -
Add latest keyboard shortcuts to "old" design experience
This user likes the fact that all tools display on the screen at all times in the "old" design experience, but likes the expanded keyboard shortcuts seen in the "new" design experience
2 votes -
Persist panel placement method selection
This user wants their choice between "auto" and "manual" panel placement method to persist until they change it
Today, as soon as the menu is closed, and re-opened, "Auto" is pre-selected
2 votes -
New Proposal PDF Cover Page to Include More Customer Info
Current behavior:
- PDF includes project address on cover pageClient request:
- Client requesting PDF cover page include customer name, address, phone number and email.2 votes -
Multiple Inflation Rates Modeling Capabilities on Proposal
Utility, Florida Power & Light, adjusts utility rate based on previous year hurricane activity. Client requested ability to have multiple utility rates modeled in the proposal to account for these rate changes.
2 votes -
As an installer, I want to see if a project has a signed document at a glance
User doesn't want to have to click around too much from the project overview to see which documents have been imported, sent or signed. They want this data front and center on the project overview.
2 votes -
Support for SMUD's low-income Energy Assistance Program (EAPR)
Building in support in Solargraf's utility settings for SMUD's low-income bill discount, the Energy Assistance Program (EAPR).
Website: https://www.smud.org/Rate-Information/Low-income-and-nonprofits
2 votes -
As an installer, I want a seperate materials list for System expansion projects
Right now, when we select materials they are added to a singular list.
We would like them segmented for new projects vs System expansion. This would also mean that only materials related to each project would be available upon project creation.
2 votes -
Selective Discharge for Battery
Selective Discharge for BDT
2 votes -
2 votes
-
Solar Battery Savings Program
Cash rebate in san diego called SDCP that provides 4725 cash for a powerwall 3 and 400 annually
2 votes -
Existing System Toggle needed
Projects with Existing Systems. Ideally we would have a toggle to turn on/off the existing details when running calcs. This way we can distinguish between what the new equipment does on its own vs. what the system with do overall. If not a toggle, then we need the option to remove existing system from a customer profile once it has been entered. I can not proceed once I trash the existing details because save is not an option.
2 votes -
Support delayed payment start for lease and PPA options
Needed ability to set the start-date of Lease payments. Our company covers the first 12-months of lease payments for our customers and we'd like to be able to show the customer that they will not have a solar lease payment for a whole year.
In past, we have also received request for downpayment/due at signing for lease and PPAs.
2 votes
- Don't see your idea?