EDT enhancements: to have the choice to display a distinct main panel and separate utility meter when conducting a design
When conducting a design with a load-side breaker incorporated into the sub-panel and the one-line diagram depicting the main panel as a meter main combo, we prefer to have the choice to display a distinct main panel and separate utility meter.
1
vote