Skip to content

Solargraf Features


Solargraf Features

Categories

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

845 results found

  1. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Want to be able to know when LR agreement is signed by HO and pull via API into CRM.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. As an installer, I would like to be able to move LiDAR data points beyond the current limits when they don’t align with the building in the imagery.
    This would allow for more accurate roof modeling when LiDAR data does not match the underlying image.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Came from a enterprise lead.

    They defer escalation for 5 years

    M0 - M60 0%
    M61 - M360 2.99%

    SG logic only allows 1 x escalator for full term

    Ideal would be to add an additional box with deferment

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Financing  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Incentives  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Make a toggle on the proposal template to remove cents from the proposal.

    For example:

    Monthly savings: $127.34 to just Monthly savings: $127

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. As an installer, I would like to be able to convert a design option from System expansion back to New system.

    Currently, an option can be changed from New system → System expansion, but this change is one-way. Once an option is set as a System expansion, it cannot be converted back to New system from within the project.

    Allowing bidirectional conversion would reduce rework and confusion.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    Under review  ·  0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. As an installer, I would like to generate required “Solar Energy System Supporting Information” forms directly in Solargraf.
    This would allow system details to be automatically populated and included with contract documents, reducing manual data entry and errors.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    In Progress  ·  0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. As an installer, I would like the PDF proposal to include the same detailed information that is available in the web quote.

    Currently, the web quote displays additional details in the monthly breakdown (via pop-up views) that are not included in the PDF version. Including this information—such as production exported—would ensure consistency between the web and PDF proposals and reduce the need for follow-up explanations or manual documentation.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. As an installer, I would like to set a default height for obstructions when adding them to projects.
    This would reduce repetitive manual adjustments and speed up project setup.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. As an installer, I would like the ability to adjust the maximum string length when generating a permit set.
    This would allow the auto-generated permit documents to better match project-specific design requirements and local permitting standards.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. As an installer, I would like a copy of the signed proposal PDF to be automatically downloaded and emailed to the homeowner once they sign.
    This would ensure homeowners receive their signed documents immediately and reduce the need for manual follow-up or re-sending files.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. I want to see:
    Change order submitted (inc. date)
    Documents/contracts sent to HO

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Financing  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. . Client requested Gross Price be moved to the top line for better readability and flow, followed by incentives, then final cost.

    example:

    Gross Price: $58,000
    Residential Renewable Energy Tax Credit - 30%: -$17,400
    Cost After rebates and incentives: $40,600

    Attached an image on how the PDF proposal currently shows the order.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. As an installer I would like the Electrical design tool to be available in Canada

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. As an installer, I would like to bulk download PDFs across multiple projects instead of downloading them one at a time.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. As an installer, I would like Solargraf to support a pre-paid lease option for HDM projects.

    In this model, the customer pays 80% upfront, and HDM pays the remaining 20% to the contractor on the back end. The lease term is 6 years, after which the customer owns the system.

    Supporting this structure in Solargraf would allow installers to accurately model pricing, payments, and ownership terms without using workarounds.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Financing  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. When generating a Single Line Diagram (SLD) for a Tesla Powerwall 3, Solargraf currently defaults to a 60A backfeed breaker, even though an 80A backfeed is supported by Tesla.

    In addition, the SLD includes a Rapid Shutdown Device (RSD) even when the inverter/battery is installed outdoors, where an RSD is not required.

    It would be helpful to be able to edit these values directly within Solargraf (e.g., backfeed breaker size and RSD inclusion) instead of having to modify the DWG manually.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?