871 results found
-
As an installer, I want to be able to use different fonts when using Custom Proposal
Specifically:
-Roboto
-Open Sans1 vote -
1 vote
-
1 vote
-
Permit Portal Status Updates
Client would like to see permit status updates similar to project status updates (New, Sent, Viewed, Signed).
Client suggests permit portal contains ststus updates letting installers know when their permit request has been seen.
1 vote -
Filter roofing loans from solar loans
This user wants to filter the list of loans that appear in a project to show only those that are applicable to roofing, or only those that are applicable to solar. This will avoid sales reps accidentally using a home improvement (roofing) loan for a solar project or vice versa
1 vote -
Default Terms & Conditions on basis of proposal template used
This user wants to create various proposal templates, and then various terms & conditions templates, and then pick which T&Cs template should be used by default whenever a specific proposal template is used. The ask is primarily for roofing-only proposals, but is applicable to any proposal
1 vote -
1 vote
-
Permission to control who can order expedited design orders
This user wants some users to be able to order expedited designs, while others can only order regular designs
1 vote -
User preference or setting to default consumption unit when creating projects
This user typically always enters monthly bills when creating a project
He wants a way to define that whenever he goes to create a project, the "input" field in the consumption section should automatically select "monthly bills"
1 vote -
Choose whether or not arrays are grouped on the shade report
Currently, any two (or more) panel arrays that share the same azimuth, tilt, hardware and spacing are grouped on the shade report.
The Energy Trust of Oregon pay their incentive on a per-array basis, meaning it can be advantageous to present arrays separately, where one array qualifies and the other doesn't. This user thus wants to be able to choose if arrays should be grouped or not
1 vote -
Edit panel offset for an array that is already created
We currently only allow users to choose between a "full" or "half" panel offset before an array is placed. This user wants to be able to change that after the fact (rather than having to delete the array and start again)
1 vote -
Edit tree heights in bigger increments
This user wants to increase or decrease the height of a tree by more than 0.1 inches when using the arrows
1 vote -
Snap panel arrays to setbacks
This user wants panel arrays to snap to a nearby setback, whenever they move an array
This helps them to ensure no empty space is left unused between the setback & panels
1 vote -
Formula Based Custom Placeholder Results to be Limited to 3 Numbers After Decimal
Client is requesting custom placeholders set with formula to limit the amount of digits after the decimal when presented on their contract.
Current behavior: Formula will calculate properly, but the number presented on the contract is showing upwards of 11 digits after the decimal of the main number (Screenshot attached)
Client is requesting remainder digits after decimal point of main number be limited to 3 digits.
1 vote -
As an installer I would like to be able to upload my own LiDAR data for a project
As an installer I would like to be able to upload my own LiDAR data for a project
1 vote -
Integrate Adobe Sign for e-signature capture alternative to Docusign
Client is requesting Adobe Sign to be integrated to Solargraf as an alternative to Docusign for E-signature capturing.
Additionally, new client All Energy Solar, is requesting alternative e-signature capturing integration from Blue Ink.
1 vote -
Ability to rename Label on Proposal from "System Cost to System Price"
Allow customization of pricing breakdown labels within proposals, including the ability to rename terms such as system cost to system price
1 vote -
Improve ease of use for document placeholders
Simplify contract placeholder management by making placeholders easier to find and use
1 vote -
One-click path from proposal to final contract
Add a one-click path from the proposal to the final contract so customers can review the complete contract terms before accepting the proposal
1 vote -
1 vote
- Don't see your idea?