Skip to content

Solargraf Features


Solargraf Features

Categories

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

832 results found

  1. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. As an installer I would like the Electrical design tool to be available in Canada

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. As an installer, I would like to bulk download PDFs across multiple projects instead of downloading them one at a time.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. As an installer, I would like Solargraf to support a pre-paid lease option for HDM projects.

    In this model, the customer pays 80% upfront, and HDM pays the remaining 20% to the contractor on the back end. The lease term is 6 years, after which the customer owns the system.

    Supporting this structure in Solargraf would allow installers to accurately model pricing, payments, and ownership terms without using workarounds.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Financing  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. When generating a Single Line Diagram (SLD) for a Tesla Powerwall 3, Solargraf currently defaults to a 60A backfeed breaker, even though an 80A backfeed is supported by Tesla.

    In addition, the SLD includes a Rapid Shutdown Device (RSD) even when the inverter/battery is installed outdoors, where an RSD is not required.

    It would be helpful to be able to edit these values directly within Solargraf (e.g., backfeed breaker size and RSD inclusion) instead of having to modify the DWG manually.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. As an installer, I would like the option to apply a percentage-based discount to the gross system cost before incentives are calculated.

    Currently, percentage discounts are applied after incentives, which limits pricing flexibility.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Others  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. For example SILFAB440 has 5 different SKU.

    This can be confusing to Sales rep and allows mistakes to be made.

    We'd like to be able to map SKU in company settings.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Financing  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Current behavior:

     - PDF includes project address on cover page
    

    Client request:

     - Client requesting PDF cover page include customer name, address, phone number and email.
    
    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Client requesting additional payment step placeholders for document creation

    Installation step payment

    Activation step payment.

    Also requesting a text box placeholder for unique information to be typed in and added to individual projects.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Although we do support price tables per state, we support only one per state. If an installer wants their reps to choose between a “premium” panel at $3.50 per watt in California, or a “standard” panel at $3.25 per watt in California, they currently can’t do so.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. User doesn’t want his reps to have to change the DC to AC ratio on every project. But he doesn’t want more than one PW3 inverter to be added when auto-stringing. So either we change auto-stringing such that it doesn’t ask for target DC to AC (or rather, asks for desired quantity of inverters), or we let him define his own target DC to AC ratio (in his case, 1.45) which is used by default on new projects.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. As an installer I would like to be able to download Docusign documents separately even if they were originally sent together in one envelope. Each document should be able to be downloaded individually once signed

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. The new commission adder feature is a great addition. However, commissions in our workflow are calculated as a percentage of total system cost.

    Currently, commission adders only support flat dollar and $/Watt options. Adding a % of system cost option would better support common commission structures and reduce the need for manual calculations.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Installers would like the ability to add custom or new panel materials directly in Solargraf without needing to submit a request for Solargraf to add them.

    This would improve flexibility when working with new manufacturers, temporary supply changes, or non-standard panels.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Materials  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. This user had solar price set to $0 (as is their standard practice, they price using adders)

    And went to import TPO products. The dialog told them to add a customer name, phone and email (which were all present). The dialog advised there were no products to show.

    When the user set a solar price greater than $0, the financing products were successfully imported

    This user wants better guidance (in-app) on how to resolve such issues

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Financing  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Client is requesting functionality to see commission while selecting TPO rate from pricing matrix.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Others  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. This user wants the project title to be automatically defined as the project address or customer name, depending on a user preference

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. We normally model trees by fixing the top of the crown to the lidar, then adjusting the crown's height downwards.

    Currently, when I set the top of the tree to match the lidar, then increase the height of the crown, the top of the tree moves away from the ground (and no longer aligns to the lidar)

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. This user suggests using a forest green for the tree crown, in order to make the trees look less "cartoonish"

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. This user wants help maintaining 90 degrees angles (or really, any angle that is a multiple of 45 degrees) when moving a roof edge

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?