832 results found
-
1 vote
-
Electrical design tool available in Canada
As an installer I would like the Electrical design tool to be available in Canada
1 vote -
Bulk download PDFs for multiple projects
As an installer, I would like to bulk download PDFs across multiple projects instead of downloading them one at a time.
1 vote -
Add support for pre-paid lease financing for HDM
As an installer, I would like Solargraf to support a pre-paid lease option for HDM projects.
In this model, the customer pays 80% upfront, and HDM pays the remaining 20% to the contractor on the back end. The lease term is 6 years, after which the customer owns the system.
Supporting this structure in Solargraf would allow installers to accurately model pricing, payments, and ownership terms without using workarounds.
1 vote -
SLD Generation for Powerwall 3 - 80A Backfeed and RSD Not Needed
When generating a Single Line Diagram (SLD) for a Tesla Powerwall 3, Solargraf currently defaults to a 60A backfeed breaker, even though an 80A backfeed is supported by Tesla.
In addition, the SLD includes a Rapid Shutdown Device (RSD) even when the inverter/battery is installed outdoors, where an RSD is not required.
It would be helpful to be able to edit these values directly within Solargraf (e.g., backfeed breaker size and RSD inclusion) instead of having to modify the DWG manually.
1 vote -
Enable % of gross cost discounts to be applied before incentives
As an installer, I would like the option to apply a percentage-based discount to the gross system cost before incentives are calculated.
Currently, percentage discounts are applied after incentives, which limits pricing flexibility.
1 vote -
As an installer, I'd like to be able to limit the SKU selection drop-down on GL app page
For example SILFAB440 has 5 different SKU.
This can be confusing to Sales rep and allows mistakes to be made.
We'd like to be able to map SKU in company settings.
1 vote -
New Proposal PDF Cover Page to Include More Customer Info
Current behavior:
- PDF includes project address on cover pageClient request:
- Client requesting PDF cover page include customer name, address, phone number and email.2 votes -
Additional Timeline Payment Step Placeholders/Text box placeholder
Client requesting additional payment step placeholders for document creation
Installation step payment
Activation step payment.
Also requesting a text box placeholder for unique information to be typed in and added to individual projects.
1 vote -
As an installer, I want to define multiple solar price tables per state
Although we do support price tables per state, we support only one per state. If an installer wants their reps to choose between a “premium” panel at $3.50 per watt in California, or a “standard” panel at $3.25 per watt in California, they currently can’t do so.
1 vote -
As an installer, I want to define a custom target DC to AC ratio
User doesn’t want his reps to have to change the DC to AC ratio on every project. But he doesn’t want more than one PW3 inverter to be added when auto-stringing. So either we change auto-stringing such that it doesn’t ask for target DC to AC (or rather, asks for desired quantity of inverters), or we let him define his own target DC to AC ratio (in his case, 1.45) which is used by default on new projects.
1 vote -
As an installer I would like to be able to download Docusign documents separately even if they were originally sent together in one envelope
As an installer I would like to be able to download Docusign documents separately even if they were originally sent together in one envelope. Each document should be able to be downloaded individually once signed
1 vote -
% of system cost commission option
The new commission adder feature is a great addition. However, commissions in our workflow are calculated as a percentage of total system cost.
Currently, commission adders only support flat dollar and $/Watt options. Adding a % of system cost option would better support common commission structures and reduce the need for manual calculations.
1 vote -
Allow adding custom panel materials without Solargraf request
Installers would like the ability to add custom or new panel materials directly in Solargraf without needing to submit a request for Solargraf to add them.
This would improve flexibility when working with new manufacturers, temporary supply changes, or non-standard panels.
1 vote -
Explain why integrated TPO products can't be imported to a project
This user had solar price set to $0 (as is their standard practice, they price using adders)
And went to import TPO products. The dialog told them to add a customer name, phone and email (which were all present). The dialog advised there were no products to show.
When the user set a solar price greater than $0, the financing products were successfully imported
This user wants better guidance (in-app) on how to resolve such issues
1 vote -
Commission per TPO when selecting TPO rate
Client is requesting functionality to see commission while selecting TPO rate from pricing matrix.
1 vote -
Automate project title as customer name or address
This user wants the project title to be automatically defined as the project address or customer name, depending on a user preference
1 vote -
Make total tree height constant when I edit tree crown height
We normally model trees by fixing the top of the crown to the lidar, then adjusting the crown's height downwards.
Currently, when I set the top of the tree to match the lidar, then increase the height of the crown, the top of the tree moves away from the ground (and no longer aligns to the lidar)
1 vote -
Show tree crown in forest green
This user suggests using a forest green for the tree crown, in order to make the trees look less "cartoonish"
1 vote -
Maintain 90 degree angles when moving a roof edge
This user wants help maintaining 90 degrees angles (or really, any angle that is a multiple of 45 degrees) when moving a roof edge
1 vote
- Don't see your idea?