Skip to content

Solargraf Features


Solargraf Features

Categories

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

832 results found

  1. This user doesn't like that the camera continues to rotate after his click and drag action ends, where he is rotating (or panning) the camera

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Financing  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Installers would like the ability to enter negative usage values for system expansion or battery add-on projects.

    This would better support projects where existing production exceeds usage or where usage adjustments are required as part of an expansion.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. This user wants to choose the lidar data set that is used in a design (where more than one exists). If the user has some knowledge about when the home was built or last remodeled, they can be make an educated decision on whether to use older lidar that is higher quality, or more recent lidar that is lower quality

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. This user advises that pathways are most relevant for the fire service, so we should label our features "Setbacks" and "fire pathways" rather than "fire setbacks" and pathways"

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Installers would like the ability to compress the PDF file size when downloading proposal documents.

    New proposal PDFs are larger than classic templates, which can make it difficult to send proposals in bulk or meet email size limits.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. The users need "Departing Load Charges" for Non-Export solar systems in California to be modeled in Solargraf and these charges to be included in the remaining solar bill calculations.

    The CPUCs in California add "Departing Load Charges" to Non-Export system clients.
    Initial research showed these charges are not explicitly listed in Genability tariffs and must currently be added manually as custom costs.

    I can confirm that these charges are already incorporated into the pre- and post-solar tariffs of California utilities. The utility has indicated that this rate schedule consists of multiple charges, all of which are reflected in our tariffs.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Reports should clearly indicate which system types were quoted and whether the proposal included a battery system.

    Adding this information would make reports easier to review and more useful for tracking what was bid.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Client would like to model down payments when using TPO lease finance options.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Financing  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Self-permit automation should support Tesla Powerwall 3 (PW3) projects.
    Adding PW3 compatibility would allow installers to generate permit documentation without manual adjustments when using this equipment.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Installers would like the ability to create EV charging–only project types when generating proposals.

    This would support projects that do not include solar or battery systems and avoid workarounds when proposing EV charger installations.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Utility, Florida Power & Light, adjusts utility rate based on previous year hurricane activity. Client requested ability to have multiple utility rates modeled in the proposal to account for these rate changes.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Installers would like the ability to change the header label in the web proposal from “Your Energy Consultant” to a custom title (e.g., “Solar Project Manager”).

    This would allow teams to better reflect their internal roles and branding in customer-facing proposals.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. As an Installer I would like Solargraf to update the SWR Incentive in Oregon.

    Per the DSIRE database it is still active, but I am seeing that in Solargraf, its been noted as "Ended August 18th 2025"

    In addition, I did notice that it gave the maximum allowable amount, instead of utilizing pricing that fluctuates based on what is selected to be installed. I have a sales rep who is saying that a 10C battery proposal should have a $7500 amount, and an $8250 amount for a 20C (2x 10C) batteries. The incentive is capped at $10,800 but I don't…

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Incentives  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. As an installer I would like instructions to press enter after typing CC email addresses to be clearly explained when sending proposals

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. The idea would be if a client inputs an address that exists within the Enphase enlighten app, we can then pull the existing system data for that site and make the system expansion process faster and easier on the predesign page.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Redundant labels
    Including “Option 1” and “Buy Option” in the proposal content is unnecessary, as this information is already clearly presented in the navigation bar. Removing these labels from the body would streamline the layout.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Proposal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Client requested an ability to create 3 phase systems (mostly ground mounts) as that is a primary use case for his business.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
1 2 5 7 9 41 42
  • Don't see your idea?