832 results found
-
PDF file size/compression
File size compression from DWG to PDF, the file exceeds 30MB which is causing some difficulty for AHJ permitting submissions and other transmission issues.
1 vote -
As an installer, I'd like to restrict my child accounts to be able to only create projects in certain states
We want to restrict dealers to only quote in their state.
1 vote -
Adding Additional Payment Period Payment Line When ITC is Present
Client states when the ITC is applied and the initial payment period is the higher payment, the savings section (screenshot attached) should have the reduced payment as a line item instead of having the reduced payment in the fine print below the section. Client states the reduces payment in second payment period is a selling point and he would like it shown more prominently.
1 vote -
Edit name/phone number for solar rep in proposal without adding them as user
Would like the ability to change the solar representatives name and phone number listed on a proposal, without adding them as a user in SG.
1 vote -
Add Monthly Lease Payment in Dollars
In some financiers' portals, the rep receives a monthly payment. PlugPV wants to be able to enter this under financing options as well as adding a tile on the proposal containing the dollar amount lease payment. Solargraf should in this case reverse engineer the rate (where rate * production = payment).
1 vote -
List of Ideal updates needed visible on Solargraf
Want access to suggestions panel and voting to be on main page in Solargraf
1 vote -
7 votes
-
Canadian Version of EPA Calculator
Client requesting there be a Canadian version of the EPA calculator link for Canadian proposals.
1 vote -
Update Canadian Incentive Capabilities in Solargraf
1) Ontario incentive through Save On Energy- $860/kW on systems 50kW AC or larger. Current manual modeling ability only calculates DC, Needs option for AC calculations.
2) Canadian Carbon Credits- Add ability to model carbon credits for Canadian clients.
3) Canadian version of MACRS- Canada offers company incentives similar to MACRS in the US. Client would like to be able to model that in Canadian commercial projects.1 vote -
1 vote
-
1 vote
-
As an installer, I would like a new formula for adders: $ / SQ of PV-hosting facets
When we are doing tile roofing with frames. We only want the $/SQ to correlate to the facet with PV only. All other facets should be excluded from SQ calcs.
1 vote -
As an installer I want to increase the number of battiers. Up to 16 for PW3 and 24 for IQ5P
Right now it's maxed at 4 for PW3 and 8 for IQ5P, we can install multiple gateways with 4 PW3 per gateway. Meaning we can easily exceed 4 PW3.
3 votes -
As an installer, I would like the Lead details displayed in the email body content
We would like the below included in the email received when assigned a lead:
Client name:
Full address:
Phone number:
Email:
Notes:1 vote -
As an installer, I'd like line breaks in the notes section of Leads
Today, the leads notes section comes in as one long sentence, this is tough to read. We'd like to be able to add line breaks in there to make it more readable.
1 vote -
Selective Discharge for Battery
Selective Discharge for BDT
2 votes -
Imaging UI Changes For Project Creation
Client would like to see click and drag functionality at project creation for selected image to more accurately center the image rather than clicking directional arrows for image centering. Client also would like to see mouse scroll wheel functionality for zooming in/out at project details page in image creation.
1 vote -
Proposal/PDF Font Expansion
Client uses 3rd party Acrobat software to edit his PDF proposals. Currently, the available fonts in the proposal customization do not translate into Acrobat so the client would like additional, commonly used fonts to be made available on Solargraf.
1 vote -
Classic 2D Tool Project Level Inverter Order
Client would like to see his company inverter list reflect in the same order at the project level as he has them in the company settings (Classic tool functionality). Currently, when changing inverters on the classic tool project, the client is required to scroll through the entire list of inverters, some of which he never uses and they are in no particular order, or perceived that way.
1 vote -
Support delayed payment start for lease and PPA options
Needed ability to set the start-date of Lease payments. Our company covers the first 12-months of lease payments for our customers and we'd like to be able to show the customer that they will not have a solar lease payment for a whole year.
In past, we have also received request for downpayment/due at signing for lease and PPAs.
2 votes
- Don't see your idea?