845 results found
-
Co-sign field in proposal/quote
Please include co-signer field on all proposals. About 30% of my projects now require co-signers.
1 vote -
Support ADU Accessory Dwelling Units as an array type
Support ADU Accessory Dwelling Units as an array type. In California they often build external structures, right now when they design these arrays, they are floating panels in the backyard of the house and it deosnt look good to the homeowners.
1 vote -
The option to override inverter number erasing the content as you type
The user would like for the option to enable a toggle somewhere which would allow for them to enter a number on the inverter field without having to erase the number which was previously there. They click on the field box and by clicking on it it already cleared the content.
"When I go back to edit inverters in the project, I have to delete the data from the cells before adding new information. When I type new information it should automatically overwrite the old info."
1 vote -
Alphabetize the utility tariffs in Automatic Usage Rate
Alphabetize the utility tariffs in Automatic Usage Rate
https://enphase.lightning.force.com/lightning/r/Case/5003m00001SjeaxAAB/view1 vote -
1 vote
-
1 vote
-
1 vote
-
1 vote
-
Solargraf make .PAN file types
Have solargraf make .PAN file types : I have developers asking for specs AND .PAN files.
now 2 different large project leads according to my salesman1 vote -
Allow installer to sign before homeowner
I would like to be able to sign the contract as the installer before sending it to the homeowner to be signed and approved.
1 vote -
1 vote
-
Aphabetize the utility tariffs in Automatic Usage Rates
Aphabetize the utility tariffs in Automatic Usage Rates - Would be good if you could organize the Rate Plan list a little better so you don't have to scroll through so many scattered options. Group all the TOU-C Rates together.
1 vote -
Use Site Assessment photos for permit drawings
It would be extremely useful if after using the Launch Site Assessment portion of the project and you have finished uploading the photos taken that these photos be automatically imported into the request permit required photos when requesting permit drawings.
https://enphase.lightning.force.com/lightning/r/Case/5003m00001SQKn3AAH/view1 vote -
Improve reporting functionalities in Solargraf
To add more reporting functionalities.
Analytics on what the sales reps are doing ( what they are quoting and how they are doing it)
Projects created; quotes sent
How many Cell Fab 370 panels have the quoted
How many batteries have they quoted
Average price per watt
How many clients have been quoted
How many projects have been signed
How many quotes does it take to close a deal
2 votes -
Ability to add users to project at company level
I would like certain admins to be notified when a proposal is signed. Currently, they have to be added manually to each project. I would like to be able to set up notifications at the company setting level rather than at the project level so we don't have to add users for every single project.
1 vote -
Timelines by state
When we select the timeline in settings the first option should be State. Then each state will have its on timeline. Ie Approvals(utility) in CT take about 45days longer then FL.
2 votes -
Book a meeting feature
To whom ever views these request,
Please view attachment. If Solargraf/Enphase is planning on having this feature please have a setting to be able to set/edit available times or not allow clients to double book. Or very simple integrate with Calendly!
Also I can’t remove this feature for all estimates we have sent out. So now if a customer decides to book a meeting i will have to inform them “SORRY our system doesn’t work and we need to reschedule”
Please keep it really simple guys! Fix it!! Lol
2 votes -
Default Material Groupings
When certain materials such as roofing material is set, a default preset list of components are assigned to the project. For example: If rolled asphalt is set as roof material; racking, standoffs and flashings are set to predetermined (by the company) default components.
2 votes -
Upgrade for user managment and exporting of proposals.
1, Make the proposal information exportable, with a field that says what project it's associated with. 2. Keep the old owner for a project or at least a placeholder that says who the old owner was when we delete a user. Right now if I delete a use all their info goes to me, Brian and how will I know what projects were the old users projects?
Thank you!
1 vote -
Add Load Calculation for New construction Project
Please add option to calculate loads (appliances, etc.) while designing a project for a New Construction Project (for a non-battery system as well)
https://enphase.lightning.force.com/lightning/r/Case/5003m00001SQKsEAAX/view1 vote
- Don't see your idea?