845 results found
-
Would like link expiration date to be visible to homeowner
As an installer I want the link expire date to be visible to the homeowner.
1 vote -
Two sets of pricing for grid tied batteries
As an installer I would like to be able to set two sets of pricing for batteries in the battery price table for batteries in grid tied or full backup arrangements
1 vote -
Ability to add additional paydown amounts to my financial options to show different re-amortized payments
As an installer I would like to be able to add additional paydown amounts to my financial options to show different re-amortized payment amounts with different additional paydown amounts
1 vote -
Design and Equipment Report
Hello All,
Can you please create or add to the roof report a page that shows the roof design with the panels and then lists the equipment below (ie. modules and inverters, the count of each, and the model description from the equipment selection).
This would be incredibly helpful.
Thank you!
1 vote -
Old loans expiring
User said:
Past Proposals with loans that no longer apply should either update automatically or expire letting the rep know they need to delete the old loan and toggle the new one on.
1 vote -
1 vote
-
To an user path when adding Enphase equipment
When adding Enphase equipment. It should be more intuitive. For example, the design tool should guide clients on how many inverters and equipment they should add based on the number of panels they added, etc
1 vote -
New design tool enhancements: Solargraf cannot spare boxes on the exterior of the house
New design tool enhancements : Solargraf cannot spare boxes on the exterior of the house ( Aurora offers this service )
1 vote -
Grid Import/Grid Usage discrepancies web-quote
Why does it say Grid Import on the Usage Breakdown, but Grid Usage (kWh) on the Monthly Breakdown?
1 vote -
As installer I would like to see Gross Income subtracted from monthly bill on Gross feed in Tariff proposals
As installer I would like to see Gross Income subtracted from monthly bill on Gross feed in Tariff proposals
1 vote -
1 vote
-
As an installer, I want Adder-based incentives with income profiles
As an installer, I want Adder-based incentives with income profiles
1 vote -
Roles and permissions structure
Hi, for roles and permissions under users.
Can you make the managed by and manages fields visible when making edits to current users?
For example, when we create a user along with their roles and permissions, at the bottom of the permissions, there are 2 fields that we can choose from which is "manages" and "managed by".
1 vote -
1 vote
-
More customizable proposal sections
Add the ability to "drag & drop" proposal sections, possibly resize them, and toggle on/off different values within sections. An example of this would be in the "Energy Usage" section. Being able to default view the monthly graph and toggle the different consumption/production/utility values on/off. Another option could be to show utility above production and the sum of the two equaling consumption.
4 votes -
Prevent child roles and permissions (pricing permissions)
As a parent account owner, I would like to be able to restrict our children account owners from editing the pricing in Discounts & Extra Costs. I would like to be able to do this from my own account without having to access each child account to change the account owner's roles and permissions.
1 vote -
SG charges sent as email notifications
email notifications for when we are billed. most businesses need these charges entered into their system for tracking. an email would help charges not fall through the cracks.
1 vote -
As SG, allow users to setup deposit milestone which do no impact "% of project price" calculations
As SG, allow users to setup deposit milestone which do no impact "% of project price" calculations
1 vote -
Void Previous Contract Icon
Sometimes a customer signs a contract and changes need to be made after signing. We clone the project, make the changes and the customer signs the new proposal, we would like to see some sort of void previous contract icon when a second proposal is needing to be signed. This avoids confusion and incorrect documentation being used.
1 vote -
Support larger commercial systems
Improve the capacity of the drawing tool for commercial designs.
23 votes
- Don't see your idea?