SignNow Integration
Integration with SignNow Document signing option. Offers same as Docusign at a way cheaper price. Also has api integration capability.
1 vote -
Black on black panels
We would like to see the black-on-black panels, specifically the Q.PEAK DUO BLK ML-G10.a+ 400Watt show as all black panels. Right now, there are grey borders around the entire panel and around each cell. We would like those to be black. A screenshot is attached for how we would like it to look.
2 votes -
Additional Contract Placeholders
Requesting the following additional contract placeholder fields:
Payment Schedule
ITC %
Verbiage on initial and second monthly payments per each loan option if ITC is or is not paid down3 votes -
De-couple ROI and Payback to display on proposal
Can you please give us an option to show ROI or Payback in years.. Right now this setting is a combo setting, so if we want to see # of years for payback, we also must display the ROI. I would like those two numbers to be de-coupled so we can show one or the other, or both if we choose. Thank you.
1 vote -
Change Name of "Grid Tied Battery" in Battery Design
On your Battery Design page, it is confusing how you name the check box/option for "Grid Tied System" - Please consider changing the name of this check box. Most battery-backup systems are still grid-tied. So if you're needing that check box to signify that the battery "will not be backing up the home when the grid is down," i.e. for NEM3 bill savings optimization, then the field maybe should be named "Battery not for backup in grid outage." Or something shorter that communicates that message. Thank you for your consideration.
1 vote -
naming projects
in projects there should be a way to differ between projects at the same address. so if we have to requote at a specific address we could see the different past quotes we did and how we label them. Sometimes we have to have several because of different usage models and we can not tell what that one model is from the list.
1 vote -
2 votes
-
Solargraf should allow multi use of API keys in approved partner
AO wants to integrate multiple Mosaic accounts from different installers that operate in different states
1 vote -
Non SREC that has the ability to be based on kWh
As an installer I want to make a custom incentive based on kWh that is not an SREC
1 vote -
1 vote
-
Breakdown before and after ITC
It would be helpful to see on the yearly breakdown chart the before and after for the ITC applied to their loan. Right now, it does not have that on there and it does not show accurate ROI, Payback, and Estimated Net Savings when it is applied. Also, it does show the ITC applied in small wording below the overall amount, initial monthly payment, and estimated new total monthly payment. It would be nice from a consumer standpoint to see the new loan amount and the new estimated monthly payments with the ITC applied in the same size font and…
1 vote -
Import Docusign templates into SG
I want to import my Docusign templates into Solargraf
1 vote -
Adding multiple logos (+3-5)
When customizing our proposals we can add only one trade ally logo In the secondary logo option?
Would help sales if we could add up to four our five?
1 vote -
1 vote
-
1 vote
-
Book a meeting feature
To whom ever views these request,
Please view attachment. If Solargraf/Enphase is planning on having this feature please have a setting to be able to set/edit available times or not allow clients to double book. Or very simple integrate with Calendly!
Also I can’t remove this feature for all estimates we have sent out. So now if a customer decides to book a meeting i will have to inform them “SORRY our system doesn’t work and we need to reschedule”
Please keep it really simple guys! Fix it!! Lol
2 votes -
As an installer, I want to filter my projects list by the inverter manufacturer
As an installer, I want to filter my projects list by the inverter manufacturer
1 vote -
Enhancements to the bidirectional electric vehicle charging
Enhancements to the bidirectional electric vehicle charging
1 vote -
Add options for different preparers
On pdf proposal, would like to have the project manager show as the preparer on the first page of the proposal.
1 vote -
I need SG to be supported on Ipads.
I need Sg to be used on ipads when in the homeowners house. I
1 vote