Update PDF Quote- Usage Breakdown, Estimated Savings, Project Timeline
When generating PDF copies of Quote: Do not put the Usage Breakdown and Estimating Savings on Same Page. Usage Breakdown should be on its own. Us the extra space to show Monthly breakdown and Month specific breakdown showing two Months as options. Estimating Savings should be its own page. Can reference the pre-solar rate schedule and the post solar rate schedule on this page as well, or tie in with the Cash Savings. For the Project Timeline need to fix and have it on one page, not two.
1
vote