832 results found
-
User List Export
Allow exporting the User https://app.solargraf.com/companies/20008/users page as a CVS, or excel file. Alternatively configure the CSS of the page to allow copy pasting.
Every month our company is looking to verify no extra User accounts exists. While the project export is useful, it would likely provide duplicates in addition to missing certain users.
I was able to copy the list through a raw of the HTML, but that took a lot of additional time to sort through, and did not include email addresses. position tags, nor any other useful information.
Additionally there appear to be two different user pages. One…
1 vote -
To add an install timeline flow that guides the installer through the steps to complete a Solar project. Similar to Enerflow journey
To add an install timeline flow that guides the installer through the steps to complete a Solar project. Similar to the Enerflow installer journey
1 vote -
Proposal tracking
Use cases:
-How often do the clients open the proposal
-Where do they spend their time in which section?
-The goal is to make good use of the follow-ups. If the client hasn't signed the contract, what are the sections in which the homeowner is spending the most amount of time?1 vote -
To support detailed TOU data. Displaying hourly and daily usage
To support detailed TOU data. Displaying hourly and daily usage
1 vote -
Incorporate Enphase Enlighten
Is there a way we can link Enphase to Solargraf. I have a client that already has PV but would like battery back-up, but instead of me putting together the PV can it just take it from Enphase.
1 vote -
Open Text Box
Open text box, to be added to contract so that contracts can be customized to each client.
1 vote -
1 vote
-
1 vote
-
3rd party image editing
Adjust Image on 3rd party images
1 voteWe have requested more information from the reporter to better understand this request.
Thanks,
Nardine Hanna, Solargraf Application Specialist
-
Roof dimensions
Roofing Dimensions only show on the "Roof Design".
Is there a way we can have that listed on the Solar Design Tab site-wide?
I believe it will help Design Partners company wide who use SolarGraf make more accurate designs as they do not have to go back and forth between the Roof Design Tab and Solar Design.1 vote -
to include Fit revenue as a column in the breakdown or as a separate table that includes monthly production, self-consumption, and export-
to include Fit revenue as a column in the breakdown or as a separate table that includes monthly production, self-consumption, and export-
1 vote -
Set pool start and end time
When setting the run time for a pool pump, the selection allows the number of hours run, but it always ends at 6:00 pm.-Please allow us the ability to set the start and end time. NEM 3.0 after 4:00 pm makes no sense.
1 vote -
1 vote
-
1 vote
-
Show Energy Exported for FiT
Currently, expected exported energy is only shown to users in the form of a monthly Feed in Tariff dollar-value. We would like the ability to show customers both total expected exports (kWh) and FiT value on printed proposals (no hover-over) where the feed-in tariff value is credited toward the utility bill. As it exists, the only way to print a proposal with FiT values is to toggle-off the command to credit the FiT value against utility bills. This artificially increases the "Estimated New Utility Bill" and "Estimated New Monthly Payment" on a loan, lease, or ppa proposal.
1 vote -
Solargraf is very slow. The pages take several minutes to load
Solargraf is very slow. The pages take several minutes to load
There is not a section in particular. It could be any section.1 vote -
Apply losses individually per array
Apply losses individually per array
1 vote -
As an installer I want the Project Time Line to have a formula based on CA law for deposits
The law in CA states that the initial deposit of a project is either 10% of the gross amount of the deal or $1000 whichever is less. So it would be "If "Gross Amount" x 10% > $1000.00 then show $1000, if not then show "Gross Amount" x $10%.
The alternative display would be (but more complex):
The law in CA is: At Contract signing contractor can not charge more than $1000 OR 10% of contract price (whichever is less.)If we had a contract for 30k we can charge $1000 but not 10% (3,000)
If we could always set…
1 vote -
As an installer, I want a ground mount to look like a ground mount
Acceptance Criteria:
When an array is placed on the ground, a ground mount appears below them.
The ground mount is represented in the UI by a series of metal “poles” that stand vertically, and run from the ground to the array.
The bottom of panels placed on the ground appear 1m from the ground.
Poles appear at the center of the array, relative to the direction in which it is tilted.
Poles appear 0.5 from each edge (horizontal) of the array.
The poles are cylindrical with radius 0.1m.
3 votes -
purchasing proposal after project creation
please make it possible to order a proposal after project creation sometimes i dont know i need it until i try it myself
3 votes
- Don't see your idea?