845 results found
-
1 vote
-
Get a # of total kw needed to achieve 100% consumption
When ordering proposal, get a report/note of the total # of kw needed to achieve 100% consumption, regardless of max capacity on roof.
1 vote -
As an installer, I want a ground mount to look like a ground mount
Acceptance Criteria:
When an array is placed on the ground, a ground mount appears below them.
The ground mount is represented in the UI by a series of metal “poles” that stand vertically, and run from the ground to the array.
The bottom of panels placed on the ground appear 1m from the ground.
Poles appear at the center of the array, relative to the direction in which it is tilted.
Poles appear 0.5 from each edge (horizontal) of the array.
The poles are cylindrical with radius 0.1m.
3 votes -
Show total % of exported power annually on proposal
Show total % of exported power annually on proposal
1 vote -
1 vote
-
Mass download Quotes
I want to be able to Download all of my Previous Quotes from a specific Sales rep so that we can look over his information he has been sending.
1 vote -
1 vote
-
Clarify that % consumption in BDT is targeted NOT achieved
Clarify that the self-consumption % in the BDT is the TARGET percentage, and not the achieved percentage.
1 vote -
1 vote
-
6 votes
-
Custom Placeholder Functionality (% percentage value)
Add additional functionality to custom placeholders such as a "Deposit" custom placeholder that I can input a value of a certain percentage of system cost as the placeholder value rather than a static value.
3 votes -
Enhance EDT by including Solar Edge batteries with both (BUI) scenarios
We would also appreciate having Solar Edge options available for a battery backup. This includes both (BUI) scenarios, with and without the main breaker, as well as the inclusion of the Solar Edge energy bank.
2 votes -
30 minutes interval data template
Need a template of 30 minutes interval data import template
1 vote -
Rearrange the order for lease options
Allow users to manage the display order of lease options in the same way that loans options can be ordered / organized. Currently if there are more than one lease option users can not manage the order in which the leases are presented to a customer.
1 vote -
Ability to download previously uploaded greenbutton data and manually input hourly baseload in consumption profile
Hello, there are a few ideas I have that I think would really help as I know I definitely need these features!
1. Ability to re-download greenbutton data file that was previously uploaded to a project (see screenshot attached). This way, if we misplace our greenbutton data and want to make an entirely new proposal, we don't have to go searching for it. OR, having the ability to copy a project with the utility data, etc. and create a new project (i.e. One design option for rooftop solar and one for a ground mount design).- Ability to manually input customer's…
1 vote -
To add elevation diagrams to EDT flow
During the EDT demo , the client asked if elevation diagrams would be available, as the proper signals of the house and how it's equipped.
1 vote -
Toggle Options in Estimated Savings
Our company has many facets: Electrical, AC, Plumbing, and Solar.
We combine a lot of our deals with these different services. I.e; AC and Solar.
We are requesting a Toggle option on the Estimated Savings section of Solargraf proposals. This Toggle will allow us to swap between savings with Solar only and Pricing that includes add ons such as an AC. Combining these options is a big part in our success.
1 vote -
1 vote
-
Dark mode for Solargraf
As an installer I want the ability to display Solargraf in Dark-mode.
3 votes -
Show Energy Exported for FiT
Currently, expected exported energy is only shown to users in the form of a monthly Feed in Tariff dollar-value. We would like the ability to show customers both total expected exports (kWh) and FiT value on printed proposals (no hover-over) where the feed-in tariff value is credited toward the utility bill. As it exists, the only way to print a proposal with FiT values is to toggle-off the command to credit the FiT value against utility bills. This artificially increases the "Estimated New Utility Bill" and "Estimated New Monthly Payment" on a loan, lease, or ppa proposal.
1 vote
- Don't see your idea?