Skip to content

Settings and activity

1 result found

  1. 6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    An error occurred while saving the comment
    Eddie Keller commented  · 

    Allow 2 or more drawings for the same job so that sections that are being treated differently like a flat rubber roof on a back sunroom when the house overall is getting shingles. That way that section is not included In the shingle measurements and then the flat section can be figured separately

    Eddie Keller supported this idea  ·